Manage your account online
login or sign up here

  • Residential services

  • Home
  • Residential
  • Rates
  • “Time of Use” Rates

“Time of Use” Rates

Ontario's electricity market is changing. All homes and small businesses across Ontario will be billed for electricity using Time-of-Use rates. With this new rate structure, the price of electricity varies depending on when it is used. There are three different rate periods:

  • On-peak (when demand for electricity is highest);
  • Mid-peak (when demand for electricity is moderate); and
  • Off-peak (when demand for electricity is lowest).
T.O.U. Prices   as of May 1, 2018 
Off-peak: 6.5 ¢/kWh
Mid-peak: 9.4 ¢/kWh
On-peak 13.2 ¢/kWh

View the OEB Time Of Use Rates

Prices for the Regulated Price Plan (RPP & T.O.U.)

Consumers who purchase electricity from their local utility are charged the following rates for electricity consumption. These rates are set by the Ontario Energy Board as part of the Regulated Price Plan. If you purchase electricity from an electricity retailer, the prices you pay will be different and will be stated in the contract you signed.

Smart Meters and Time-of-Use rates are an initiative of the provincial government to promote conservation and reduce peak demand for electricity.

Peak demand happens when we all use electricity at the same time. Unlike most commodities, electricity cannot be stored and must be generated in real time to meet Ontario's needs.

Reducing peak demand is good for the environment because the power plants used to meet peak demand are usually fossil-fuel generating stations. Using them less will mean less greenhouse gases and in the long run, it will also save money. It's expensive to build and maintain power plants that only operate during peak periods.

Electrical safety

Electrical safety

Construction & renovations

Construction & renovations

Conservation Tips

Conservation Tips

POWER OUTAGE

NOTICE OF POWER INTERRUPTION

DATE:          Saturday January 19th, 2019

TIME:          From 7:00 am to 9:00 am

 

REASON:     PREVENTIVE MAINTENANCE SUBSTATION ON TESSIER ST.

 

Please note that a minor interruption is required as we start our annual maintenance procedure at our substation on Tessier Street.

The East bound of the town will be affected. 

Between Hwy 17 and the south side of Main street.

From the East bound of Edmond Street, Duplate Street, Berthiaume Street and Cameron Street. In addition, the East side only of Theriault Street will be affected.

In case of rain, the work will be postponed to January 20, 2019 at the same time.

 

pdf44kvinterruption.pdf

 

YOU WANT TO KNOW MORE

Subscribe to your Hydro News, immediately.

WWW.HYDROHAWKESBURY.CA